I SOLAR PARK – RIZOMILOS, MAGNISIA
The first solar park was constructed in February 2013 in the region of Rizomilos, Magnisia and has a power of 100kwp
In 2017 a great part of the equipment was upgraded; To maximize the intensity of incoming direct radiation and therefore increase the output, some old solar panels (20KWp) were replaced with new cutting-edge technology ones, while the old fixed arrays were replaced with innovative solar trackers.
The investment was integrated and implemented according to the NSRF Program 2014-2020 and is in the final stage of administrative integration and control.
The solar trackers have increased the ROI of the solar park and shown growth in economic output.




I PROJECT CONSTRUCTION

INSTALLED GROUND MOUNTING SYSTEMS
INSTALLED GROUND MOUNTING SYSTEMS (BEFORE THE SOLAR PANELS’ INSTALLATION)